| Sign In | Join Free | My chinacomputerparts.com |
|
Model Number : YGDD04
Supply Ability : 1500-2000 Units
Highlight : sturdy prefabricated building worker housing, weather resistant prefab building unit, fast assemble onsite housing unit
Payment Terms : L/C,T/T
Delivery Time : 25-45 Days
M2 : 14.77
MOQ : 6 Units
Packaging Details : By Pallet or As Request
Certification : ISO;CE
Brand Name : YAGO INDUSTRY
Dimension : Length 6058mm. Width 2438mm. Height 2896mm
Place of Origin : China
Practical Low‑Maintenance Mining Camp Modular Building for Remote Field Worker Accommodation Office
This practical low‑maintenance Mining Camp adopts robust galvanized light‑steel framework and high‑performance fire‑rated insulation sandwich panels. Each modular building unit comes pre‑fitted with doors, windows, floor finish and complete embedded electrical wiring inside factory. Thanks to flat‑pack knockdown construction, it lowers cross‑border logistics burden. Multiple units can be joined side‑by‑side or stacked two‑high to establish integrated worker accommodation and office zones. This Mining Camp requires minimal routine upkeep and performs reliably for long‑term remote field operations.
Our Practical Low‑Maintenance Mining Camp Modular Building is fully manufactured within YAGO’s automated production facility and complies with international field‑building standards. This Mining Camp applies heavy‑duty galvanized light‑steel frame finished with automatic powder‑coating treatment, delivering excellent rust‑resistance to reduce maintenance workload under harsh open‑air mine‑site surroundings. Wall and roof sections adopt 75 mm fire‑proof insulation sandwich panels, granting the Mining Camp steady thermal insulation, noise reduction and weather‑proof capacity.
Every unit of this Mining Camp is fully pre‑completed before shipment. Reinforced insulated steel security door, anti‑theft double‑glazed PVC windows with insect screen and heavy‑duty vinyl floor covering are all pre‑mounted. Complete pre‑routed electrical circuits including lighting sockets, air‑condition reserved circuits and leakage‑protection distribution box are embedded in each module. Upon on‑site assembly of the Mining Camp, operators only need simple power hook‑up; complicated secondary finishing work is not required.
Modular architecture enables flexible scaling for this Mining Camp. Separate building modules can be freely spliced horizontally or stacked up to two storeys. External staircases and inter‑unit connecting walkways can be supplied on demand to partition worker accommodation zones and administrative office zones. Flat‑pack packing optimizes shipping‑container loading efficiency and greatly reduces ocean‑transport cost for bulk orders of the Mining Camp. Most structural materials are recyclable. When one mining project finishes, the whole Mining Camp can be fully disassembled into flat components, transported and reassembled for another remote‑site assignment, helping clients cut repeated capital expenditure.
| Project name: 20ft container with side bathroom -- 6055mm*2435mm*2895mm | ||||||
| A | Standard Configuration | Specification | ||||
| Steel Structure System | ||||||
| 1 | Roof structure | set | 1.00 | Main roof frame: 2.3mm Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | set | 1.00 | Main floor frame:2.3mm Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | pcs | 4.00 | 2.3mm Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||||
| 1 | Roof covering | set | 1.00 | 0.4mm Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | set | 1.00 | 75mm thickness Fiber glass with aluminum foil | ||
| 3 | Ceiling board | set | 1.00 | 0.35mm Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||||
| 1 | PVC flooring | set | 1.00 | 2mm thickness Vinly floor leather with glue | ||
| 2 | Floor board | set | 0.00 | 18mm fiber cement board | ||
| 3 | Floor Bottom Cover | set | 1.00 | Pu plastic tile | ||
| ContainerWall System | ||||||
| 1 | Wall panel | set | 1.00 | 50mm Rockwool sandwich panel with 0.33mm Galvanized Powder Coated color painting steel Sheet. on both sides(white color) | ||
| 2 | Door | set | 2.00 | Insulated Steel Door. (W850*H2030mm) | ||
| 3 | Window | set | 3.00 | PVC sliding window, double glass, with fly screen and security Net (W800*H1100mm) | ||
| Container Electrical System | ||||||
| 1 | Power distribution cabinet | set | 1.00 | circuit with air-break switch, leakage protector (Main power supply cable 6m2 For industrial Socket, 1.5mm2 for lighting, 2.5mm2 for common sockets, 4mm2 for AC socket.) | ||
| 2 | Light | set | 2.00 | LED light, 24W | ||
| 3 | AC &Water heater Socket | set | 2.00 | 16A universal, with socket box | ||
| 4 | Common Socket | set | 3.00 | 10A, Universal type, with socket box | ||
| 5 | Switch | set | 2.00 | 10A , with switch box | ||
| Container Accessories | ||||||
| 1 | Side Flashing | set | 1.00 | 2 Pcs Length=5635mm, galvanized, 2pcs Length=2690mm, galvanized | ||
| 2 | Rainspout pipe | set | 1.00 | Dia. 50mm, UPVC, Length=2650mm | ||
| 3 | Pillar trim plate | set | 1.00 | Length=2520mm, 0.3mm color steel plate(with fittings & accessories) | ||
| 4 | Ceiling trim plate | set | 1.00 | Length=5640mm/2630mm, 0.3mm color steel plate(with fittings & accessories) | ||
| Plumbing system | ||||||
| 1 | washbasin | set | 1.00 | including the accessory | ||
| 2 | Closetool | set | 1.00 | including the accessory | ||
| 3 | shower | set | 1.00 | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | set | 1.00 | 6 Inch | ||
| 5 | water pipe | set | 1.00 | input and output water pipe | ||
| Additional Traingle Roof on Top of Each Block (Optional as per drawing) | ||||||
| 1 | Roof Structure | set | 1.00 | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | set | 1.00 | 0.4mm Corrugated Galvanized Powder Coated Roof Tile | ||


Q1: What routine maintenance items does this low‑maintenance Mining Camp require on mine sites? A1: Mainly regular surface dust cleaning for steel frames and panels, visual inspection of electrical box and wiring connections every few months. No complex refurbishment work is needed under normal field conditions.
Q2: Can we separate sleeping quarters and office sections physically within one Mining Camp compound? A2: Yes. You can arrange independent modular groups for accommodation and office. We can also supply partition walls, access doors and connecting corridors to achieve physical separation between functional zones.
Q3: What kind of ground condition is acceptable for installing this Mining Camp? Do we need reinforced concrete foundation? A3: Compacted and levelled gravel ground or thin concrete slab is sufficient. Heavy reinforced foundation is unnecessary, saving your civil‑engineering budget for remote mine sites.
Q4: Are there any humidity‑related concerns for this Mining Camp operating in rainy tropical mining areas? A4: Wall‑roof connection adopts sealed structural treatment; galvanized steel components resist damp corrosion. We also suggest proper site drainage design on your side to avoid ponding around camp foundations.
Q5: If we place repeat orders for additional modules later, will new modules match our existing Mining Camp in dimension and connection interface? A5: Our standard‑specification modular units maintain unified dimensional and connection standards. New‑order modules can perfectly splice or stack with your existing Mining‑Camp modules without modification.
|
|
Low-Maintenance Weather Resistant Mining Camp Modular Building for Fast Assembly Worker Accommodation Images |